This page uses javascript to help render elements, if you have problems please enable javascript.
 
You are now inside the main content area
 
 

Series and Parallel Setup and Information

Equipment

Student Stations

• HP DC Power Supply
• Vernier PC Voltage Probe
• 2 - 36” Banana Jumpers
• Series - Parallel Board

 

 

 

 

 

Instructor Stations

  • None

Lab Equipment Used

Setup Instructions

Student Stations

  1. Verify that all materials are present before proceeding to set up the lab.
  2. Plug channel one of power supply into circuit boards.
  3. Plug probes into DMM in proper locations.

Instructor Station

  1. None

Teardown Notes

  1. Visually check the boards for any broken links/damage before putting away.

Documents

Current

0323 a docx

In Progress / Beta