Skip to main content
Last Published 11/20/23
California State University, Fullerton
Hours
Hours Go Here
Lock Icon - login required
Portal
Login
Resources
Search
Search Icon
Dark Mode
Switch to dark mode
on this page
Page Topics
You are now inside the main content area
Show / Hide Left Navigation Menu
Close
Acceleration Setup and Information
Setup Time Estimates
Setup Time Estimates
Initials of Tech Doing Setup
Time Taken
Notes
Equipment
Student Stations
1 Cart track
1 Red or blue pasco cart
1 Cart fan
1 Signal bouncer
1 Motion sensor
1 Hackie sack
1 Roll of blue tape
Instructor Stations
Stack of graph paper
Extra Fans
Extra Carts
Setup Instructions
Student Stations
Verify that all materials are present ebfore proceeding to set up the lab.
Check that all batteries were removed from fans and begin charging all AA batteries.
Place Cart Tracks at the stations matching their number labels
Verify tracks are level by placing the cart on the center of the track
If the cart doesn’t remain solidly stationary, then level the track.
Insert fully charged batteries into all fans.
Instructor Station
Verify levels are at front of room.
Leave bin of Hackie sacks on instructor station.
Place extra fans with charged batteries at instructor station.
Verify there are extra available charged batteries in back, charge any uncharged AAs.
Verify the free fall demo device is available and some pre done strips are nearby.
Teardown Notes
Remove batteries from all fans and place in discharged battery bin.
Documents
Current
0223 a pdf
In Progress / Beta
Back To Page Top
mobile menu
Menu
Lock Icon - login required
Portal
Campus Wide
Resources
on this page
Page Topics
Search Icon
Search
switch to light mode
Dark Mode