Skip to main content
Last Published 11/20/23
California State University, Fullerton
Hours
Hours Go Here
Lock Icon - login required
Portal
Login
Resources
Search
Search Icon
Dark Mode
Switch to dark mode
on this page
Page Topics
You are now inside the main content area
Show / Hide Left Navigation Menu
Close
Forces Part 1 Setup and Information
Setup Time Estimates
Setup Time Estimates
Initials of Tech Doing Setup
Time Taken
Notes
Equipment
Student Stations
1 Force table
Including ring with strings
3 Pulleys
1 Pasco mass and hanger set (Blue box)
1 Force probe w/platform
1 Black metal bar
Instructor Stations
None
Setup Instructions
Student Stations
Verify that all materials are present before proceeding to setup lab.
Plug in Force probe to logger pro
Place probe on desk with platform facing upward, do not place anything on the probe.
Properly connect pulleys to force table, at no particular angles.
Instructor Station
Provide extra Pulleys and Mass Hangers at the instructor’s station.
Teardown Notes
Heights of tables are staggered to properly fit in back cabinet.
Check all blue boxes for a full set of masses and hangers.
Documents
Current
0323a Docx
In Progress / Beta
Back To Page Top
mobile menu
Menu
Lock Icon - login required
Portal
Campus Wide
Resources
on this page
Page Topics
Search Icon
Search
switch to light mode
Dark Mode