Skip to main content
Last Published 11/20/23
California State University, Fullerton
Hours
Hours Go Here
Lock Icon - login required
Portal
Login
Resources
Search
Search Icon
Dark Mode
Switch to dark mode
on this page
Page Topics
You are now inside the main content area
Show / Hide Left Navigation Menu
Close
Energy Setup and Information
Setup Time Estimates
Setup Time Estimates
Initials of Tech Doing Setup
Time Taken
Notes
Equipment
Student Stations
1 track
2 Stop Brackets
1 Blue/red Cart
Signal blocker attached to cart on spring pillar side.
1 Cart Striker (Short metal rod)
1 Mass Support
1 ruler
1 set of large masses (2x100g, 1x200g, 1x500g)
(Lab Needs to measure 200g, 400g, 600g, 800g)
One Motion Sensor
Placed behind black stop bracket closest to PC.
Instructor Stations
Box of Sand Bags
Step ladder
Setup Instructions
Student Stations
Verify that all materials are present before proceeding to setup lab.
Place tracks at the station matching their labelled numbers with ruler facing toward students.
Tracks no longer need to be against flat surface but make sure stop bracket is firmly attached to each side.
Instructor Station
Connect the lab pro to the smart board and set out 2 sand bags.
Place step ladder below motion sensor.
Calibrate smartboard PC motion sensor to proper distance.
Teardown Notes
None
Documents
Current
0323a Docx
Testing Data
In Progress / Beta
Back To Page Top
mobile menu
Menu
Lock Icon - login required
Portal
Campus Wide
Resources
on this page
Page Topics
Search Icon
Search
switch to light mode
Dark Mode