Skip to main content
Last Published 11/20/23
California State University, Fullerton
Hours
Hours Go Here
Lock Icon - login required
Portal
Login
Resources
Search
Search Icon
Dark Mode
Switch to dark mode
on this page
Page Topics
You are now inside the main content area
Show / Hide Left Navigation Menu
Close
Torque Setup and Information
Setup Time Estimates
Setup Time Estimates
Initials of Tech Doing Setup
Time Taken
Notes
EL
Equipment
Student Stations
One tall lab stand with long cross rod (Shown in image)
One pivot clamp with rotary motion sensor (Don't plug in the sensor)
An Aluminum meter stick
1 hooked mass set
Hooked Force probe
10 inch piece of string with a big loop that can fit around the ruler at one end and a small loop at the other end.
Instructor Stations
None
Setup Instructions
Student Stations
Verify that all materials are present before proceeding to set up lab.
Put the rotary motion sensor with pivot clamp on the tall rod below the small cross rod.
Put the cross rod with 90 degree clamp above the rotary sensor on the tall rod.
Attach the force probe with hook to the small cross rod
Securly put the string on the force probe for safe keeping.
Don't hang anything else on the probe
Plug the force probe into the proper port of the logger pro.
Verify there are two hanging clamps on the table
Instructor Station
None
Teardown Notes
The small cross rod and clamp can stay on the long rod.
Documents
Current
0423a Docx
In Progress / Beta
Back To Page Top
mobile menu
Menu
Lock Icon - login required
Portal
Campus Wide
Resources
on this page
Page Topics
Search Icon
Search
switch to light mode
Dark Mode