Skip to main content
Last Published 11/20/23
California State University, Fullerton
Hours
Hours Go Here
Lock Icon - login required
Portal
Login
Resources
Search
Search Icon
Dark Mode
Switch to dark mode
on this page
Page Topics
You are now inside the main content area
Show / Hide Left Navigation Menu
Close
Free Fall Error Analysis Setup and Information
Setup Time Estimates
Setup Time Estimates
Initials of Tech Doing Setup
Time Taken
Notes
Equipment
Student Stations
Stand
Elbow Clamp
Photogate
Picket Fence
Padded Foam Box
Instructor Stationsnone
Setup Instructions
Student Stations
Verify that all materials are present before proceeding to setting up lab.
Stands should be in room with elbow clamps already on them.
Insert the photogate into the elbowclamp.
Plug the photogate into the logger pro digi/sonic 1
Places the padded box under the photogate.
Check that photogate is higher than the length of the picket fence above the padded box, raise if not.
Instructor Station
If Requested setup the projectile launcher in front of the big grid to replicate the images
The first image is launched horizontally at 100 cm up
The second is launched at an angle.
Teardown Notes
None
Documents
Current
Error analysis docx
Previous
KW 2015 version
In Progress / Beta
Back To Page Top
mobile menu
Menu
Lock Icon - login required
Portal
Campus Wide
Resources
on this page
Page Topics
Search Icon
Search
switch to light mode
Dark Mode