Skip to main content
Last Published 11/20/23
California State University, Fullerton
Hours
Hours Go Here
Lock Icon - login required
Portal
Login
Resources
Search
Search Icon
Dark Mode
Switch to dark mode
on this page
Page Topics
You are now inside the main content area
Show / Hide Left Navigation Menu
Close
Simple Harmonic Motion Setup and Information
Setup Time Estimates
Setup Time Estimates
Initials of Tech Doing Setup
Time Taken
Notes
Equipment
Student Stations
1 Parallel Spring Bracket
1 Parallel Hook Bar
1 Spring set in box (2 red, 2 blue, 2 green)
1 Hooked mass set
Photogate (Lab Pro File: Pendulum Timer)
1 Tall Stand
1 Short Stand
with 90 degree clamp
Meter stick
C Clamp
Instructor Stations
None
Setup Instructions
Student Stations
Verify that all materials are present before proceeding to set up lab.
Insure all springs are not deformed.
Put the Parallel Spring bracket onto the tall stand.
It may take some force to push it down, contact a tech if you can't get it.
DO NOT HANG ANY SPRINGS, leave them all in the box.
Put the photogate on the 90 degree bracket on the short stand as shown
The Parallel Spring bracket should also have some blue masking tape over the left side, if not then put it there, cut it nicely.
Leave the bracket near center of table so it isn't accidently knocked off.
Instructor Station
None
Teardown Notes
Leave clamp and rod on stand.
Documents
Current
Instructor sheet
spreadsheet password info
In Progress/ Beta
Back To Page Top
mobile menu
Menu
Lock Icon - login required
Portal
Campus Wide
Resources
on this page
Page Topics
Search Icon
Search
switch to light mode
Dark Mode