This page uses javascript to help render elements, if you have problems please enable javascript.
 
You are now inside the main content area
 
 

Physical Pendulum Setup and Information

Setup Time Estimates

Setup Time Estimates
Initials of Tech Doing Setup Time Taken Notes
EL 1 hr 25 minutes Includes SHM teardown

Equipment

Student Stations

  • Stand with clamp and rod
  • Rotary Sensor
  • Ruler
  • Protractor
  • 2 Rotary masses

Instructor Stations

  • Rotary Motion Sensor Note

Equipment fully setup for lab use

Setup Instructions

Student Stations

  1. Verify that all materials are present before proceeding to set up lab.
  2. Hang the rotary sensor on the rod.
  3. Adjust the height and location so that the black rod of the sensor does not hit the table or the ring stand.
  4. Plug in the rotary sensor to the appropriate port on the logger pro.

Instructor Station

  1. Print out Rotary Motion Sensor Note and put on instructor station.

Teardown Notes

  • Leave clamp and rod on stand.

Documents

Current

0423a pdf

In Progress/ Beta