This page uses javascript to help render elements, if you have problems please enable javascript.
 
You are now inside the main content area
 
 

Position and Velocity Setup and Information

Setup Time Estimates

Setup Time Estimates
Initials of Tech Doing Setup Time Taken Notes
EL 1 hour 25 minutes Includes 212 Reflection and Refraction teardown and leveling the tracks for each station

Equipment

Student Stations

  • 1 Cart Track
  • 1 Red or Blue Pasco Cart
  • 1 Red or Blue Signal Bouncer
  • 1 Cart Fan
  • 1 Black Shaved Mass
  • 1 Motion Sensor

 

 

 

 

 

Instructor Stations

  • None

Lab Equipment Used

Setup Instructions

Student Stations

  1. Verify that all materials are present.

Instructor Station

  1. Extra batteries

Teardown Notes

  1. None.

Documents

Current

1122 a pdf

In Progress / Beta