This page uses javascript to help render elements, if you have problems please enable javascript.
 
You are now inside the main content area
 
 

Series and Parallel Circuits Setup and Information

Setup Time Estimates

Setup Time Estimates
Initials of Tech Doing Setup Time Taken Notes
EL  1 hour Includes 212 teardown

Equipment

Student Stations

  • 4 Flashlight bulb with base
  • 2 Battery holders
  • 2 Knife switcher
  • 1 Bundle of 6 connecting jumper wires
  • 2 NiMH rechargable batteries

 

 

 

 

 

Instructor Stations

  • Extra equipment if any

Lab Equipment Used

 

 

Setup Instructions

Student Stations

  1. Verify that all materials are present.

Instructor Station

  1. None.

Teardown Notes

  1. None.

Documents

Current

1122 a pdf

In Progress / Beta